Expansion of Central Processing Facility Completed
The newly upgraded facility increases our processing capacity by 30%, ensuring faster turnaround times and improved quality control during peak season.
Construction and calibration of our upgraded 3,500 square meter central packing and sorting facility in Meki Town has been successfully finalized.
Equipped with automated optical sorting lines and temperature-controlled pre-cooling chambers, the facility can now process up to 150 metric tonnes of produce daily.
The upgrade reduces post-harvest handling loss by an estimated 18%, preserving freshness from harvest field to export vessel.
Key Highlights
- 30% increase in daily sorting and washing throughput
- 18% reduction in post-harvest spoilage loss
- Integrated cold storage chambers ensuring continuous freshness